RM170-03 Repairs to Runway 5R/23L

Federal + Military

This Design–Build project included the design and repair of runway 5R/23L. The work includes 95,676 square yards of asphalt milling and resurfacing of runway surface, 773,865 SF of pcc pavement removal & replacement and miscellaneous spot repairs of PCC pavements, isolated PCC joint sealing, AC crack sealing, replacement of arresting gear pendant pavement protection systems, replacement of runway centerline lighting and repairs to associated equipment and systems. All work was performed on an active airfield requiring coordination with existing airfield operations on adjacent runways.